back_to_selection
blue_studio blue_studio blue_studio

PROJECT DESCRIPTION

The Project was to be the first ASB GlassFloor not installed in a squash court. Prior to the installation we had to achieve all Norm regulations for a school sports hall. The installation was a prototype. The floor is used on a daily basis at a boarding school. 4 years after the installation the floor still looks like on the first day. The feedback we received is that the floor is very low maintenance and that the kids pre fair this facility over the other two at the school.

Technical Information

Built: 09/2009

Surface: 485m2

Length 17.00m

Width: 28.57m

Colour: Bright blue

Build up: 200mm

Grip: DIN V 18032-2 (2001-04)

Elasticity: EN 14904

Line Markings: 850 m

Pieces of Glass: 165

Installation Time: 10 days

Method of installation:100% on site

Various: Permanent School Logo under the glass, 29 sleeves for sports equipment, underfloor heating